Context

First section of AIF Apps implementation (DR02 task 5.1). Review the RSE_CONFIG values the applications depend on, then push hierarchies, attributes and historical facts from RI (RADM01) to AIF Apps (RASE01) with RSE_MASTER_ADHOC_PROCESS, and validate what landed.

The push procedure itself — flag syntax, --from/--to, date validation errors — is in Push data to AIF Apps. This note records the order and flag groups used at P&C so the run can be repeated as executed.

Quick access

Review RSE_CONFIG

The plan labels this “Review system configurations for IPO-IO — see AIF Implementation Guide”. Every value reviewed, with the P&C setting, is in RSE_CONFIG parameters. Do it in APEX, or in AI FOUNDATION CLOUD SERVICE > Tasks > Control and Tactical Center > Manage Configurations.

Two of them decide whether the fact push succeeds at all: LOAD_EXTENDED_PROD_HIER and PROD_HIER_SLSTXN_HIER_LEVEL_ID — see Extended product hierarchy check.

Run RSE_MASTER_ADHOC_PROCESS

POM > Tasks > Batch Monitoring > AIF APPS > Standalone > RSE_MASTER_ADHOC_PROCESS > job RSE_MASTER_ADHOC_JOB. Navigation in How to run a POM standalone job; edit the job parameter to each group below and run them one at a time, in this order.

GroupParameterLoads
Hierarchies-pldgNz-p Product, -l Location, -d Calendar, -g Customer Segment hierarchies, -N Season Phase Item, -z Price Zone
Attributes-PLGmu-P Product attributes, -L Location attributes, -G Customer Segment attributes, -m Customer Engagement attribute, -u UDA
Orders-HO-H Buyer, Allocation, Purchase Order, Transfer loads; -O Order Cost
Supplier-USupplier, Supplier Item, Daily Supplier Cost, Supplier Inv Mgmt
Sales-xwa-x Sales transactions, -w Weekly Aggregate Sales, -a Aggregate Sales processing
Inventory-iInventory
Returns-Te-T Weekly Return transactions, -e Weekly Return Aggregation
Price-CPrice and Cost
Consumer segments-sConsumer segment data (about 1 min)
Forecast lifecycle-VForecast Lifecycle Classification (about 1 min)
Baseline-BBaseline Sales and SKU/Store Ranging calculations

The Sales, Inventory, Returns and Price groups take --from:YYYYMMDD --to:YYYYMMDD matching the range loaded into RI — how to find it, and what to do on TO date appears too far in the future, is in Push the historical facts.

-B was skipped at DR02 but LPO needs it

The plan lists the Baseline group as “not executed but is required”. It is a prerequisite for PRO_MASTER_ADHOC_PROCESS — its -b Baseline step reads what -B produces — so run it before Build the LPO application. See Push the historical facts, step 5.

Monitor the run

Each step writes to RSE_LOG_MSG. Newest first:

select * from RSE_LOG_MSG order by MSG_TS DESC;

Validate

Run the checks after the corresponding group, before starting the next:

Next section: Send data to PDS tables.


Reference